Residential

943 COALBURN WAY, Murray

$524,900.00

Bedroom 3 bedrooms
Full Bathroom 2 full baths
Half Baths 1 half baths

  • MLS #: 2017752
  • Address: 943 COALBURN WAY, Murray, UT 84123
  • Date Listed: 8/15/2024
  • Days on Market: 191
  • SQFT: 1723
  • Acres: 0.02
  • Subdivision: GALLERY ON BULLION

Location Location

Agent Comments Agent Comments
**Garbett Homes is offering up to 12k on select homes for a limited time. Contact us or visit one of our communities for details.** Don't miss this chance to own a highly desirable END townhome, setting the standard for modern, eco-friendly living. This contemporary gem meets the prestigious U.S. Department of Energy's Zero Energy Ready standards and features an EV outlet in the private garage, instant hot water systems, advanced insulation, and state-of-the-art air re-circulation systems. Enjoy abundant natural light and energy efficiency with top-quality windows, a programmable thermostat, and solar pre-wiring, resulting in overall savings on your utility bills. Located centrally in the SL Valley, this home is just minutes from I-15 and I-215, 15 minutes from the airport and downtown Salt Lake City, and within walking distance of schools, parks, and the Jordan River Trail. The community offers a park, BBQ patio, and ample guest parking for your convenience. Elevate your lifestyle in this vibrant community-contact the listing agent today!

Amenities Amenities
  • Electric Air Cleaner
  • Microwave

Interior Features Interior Features
  • Cool System: Central Air
  • Heat System: Forced Air, >= 95% efficiency
  • Floors: Carpet, Laminate, Tile
  • Interior: Bath: Master, Closet: Walk-In, Den/Office, Disposal, Range: Gas, Silestone Countertops

Exterior Features Exterior Features
  • Siding: Composition, Stucco
  • Roof: Asphalt
  • Pool: false
  • Exterior: Balcony, Sliding Glass Doors

Additional Features Additional Features
  • County: Salt Lake
  • Property Type: Townhouse
  • Tax Number: 21-14-251-050
  • Water/Sewer: Sewer: Connected
  • Stories: 3
  • Year Built: 2024